Higher Education Projects

SynEnergy has a wide array of experience working on higher education projects ranging from laboratories at the University of Colorado Boulder to campus renovations at the University of California Santa Barbara. We integrate CFD analysis to optimize HVAC design configuration and layouts for maximizing ventilation.

SynEnergy has a wide array of experience working on higher education projects ranging from laboratories at the University of Colorado Boulder to campus renovations at the University of California Santa Barbara. We integrate CFD analysis to optimize HVAC design configuration and layouts for maximizing ventilation.

SynEnergy has a wide array of experience working on higher education projects ranging from laboratories at the University of Colorado Boulder to campus renovations at the University of California Santa Barbara. We integrate CFD analysis to optimize HVAC design configuration and layouts for maximizing ventilation.

University of Colorado CryoMicroscope Laboratory


MEP Design
Boulder, Colorado
Construction Cost: <$3M
SQFT: 1,500

 

The lab was designed to provide a quasi-clean room to house hypersensitive equipment (i.e., CryoMicroscope) for researching viruses.

University of California Classroom


MEP Design
Santa Barbara, California
Construction Cost: <$5M
SQFT: 120,000

University of California Office


MEP Design
Santa Barbara, California
Construction Cost: <$5M
SQFT: 120,000

University of California Recreation Center


MEP Design
Boulder, Colorado
Construction Cost: <$5M
SQFT: 120,000

 

SynEnergy provided MEP Design services for the Rec Center which included an Olympic size swimming pool. All building systems for the University were designed to fulfill requirements for LEED GOLD certification.