Commercial Projects
5280 Market
MEP Design
Denver International Airport
Construction Cost: <$3M
SQFT: 1,951
SynEnergy provided MEP design services for the new 5280 Market concessionaire in Denver International Airport. Mechanical systems were designed to be tied to the central utility plant. Airflow balance and diagrams were analyzed to prevent pressurization issues.
Freshens Concessionaire
MEP Design
Denver International Airport
Construction Cost: <$3M
SQFT: 375
Denver Convention Center
MEP Design
Denver, Colorado
Construction Cost: <$5M
SQFT: 20,000
Melody Market
MEP Design
Denver, Colorado
Construction Cost: <$4M
SQFT: 1,603
SynEnergy provided M design and construction drawings for a former theater which was- converted to a retail minimarket located in the historic neighborhood of Five Points in downtown Denver.